I. Background & Construction Conditions
Road & Railway Transportation Center Project, located in the vicinity of Taizhou South Railway Station of Ningbo-Taizhou-Wenzhou Railway, is an important component of Luqiao’ s Luoyang Logistics Center with the main function on collection and distribution of goods from Taizhou South Railway Station. This project is to provide a great railway logistics platform for Taizhou’s social and economic development, and offer more professional and faster logistics services to consignors. It will improve Taizhou’s comprehensive transportation structure, promote harmonious development of varied transportation means, enhance the comprehensive transportation efficiency and impel faster and better development of Taizhou’ s social economy.
This center can timely distribute and transfer the large amount of goods at Taizhou North Railway Station, which focus on waste metal, steel (steel products), construction materials, plastic raw materials and plastic products. The most is a large number of good with low added value which are more suitable to railway transportation. The special freight train will be empty out to relieve railway transportation pressure.
Luqiao District, where the project is located, is in the middle coastal area of Taizhou, echoing with Haimen Port, Damaiyu Port in Yuhuan and Jiantiao Port in Sanmen. It has convenient transport in the region, where Ningbo-Taizhou-Wenzhou Railway Freight Station and Taizhou Airport is started construction. The expressways and high-grade highways have completely connected with Beilun Port of Ningbo. Taizhou is only 120 minutes from Beilun of Ningbo. The constructed Taizhou-Jinhua Expressway and under-programming Taizhou-Jinhua Railway will further strengthen the radiation capacity of Taizhou Port to the west of Zhejiang, Jiangxi, Fujian and Hunan Provinces. The Road & Railway Transportation Center will make full use of the road and railway networks to provide convenient logistics services to industrial and commercial enterprises in Luqiao and other places in Taizhou.
The project has a plain construction area. Surrounding roads will soon be available, and water, electricity and telecommunication supply pipes and wires are paved to its vicinity, which can provide favorable external conditions for the construction of the project.
Water Supply: Connecting with the main water supply pipe in Laoluyuan Road and water resource from Luqiao Drinking Water Plant
Drainage: Adopting rain and sewage divided drainage system and drainage will enter the municipal government sewage pipe network after treatment.
Power Supply: Electrical source is from Tongyu Substation.
Communication: The telephone program control and digital transmission have been realized in the region and the mobile telephone and wireless call system has been opened.
II. Preparations & Progress
The project’s proposal has been approved by the Development & Reform Bureau of the district and the land procedures for approval are under processing.
III. Construction Scale & Content
The project’s total investment is 34.5 million USD. 23.53 million USD is to be resolved by applying for loan. The project is to acquire 515.6 mu land for a total construction area of 145,200 m2 and construct Trade Tower, Comprehensive Tower, storehouses, Process Center and so on. The project is to introduce domestic advanced logistics distribution operation equipment with a total purchase expense of 5.18 million yuan (including equipment installation fees).
The project’s overall layout is divided into three districts such as trading office district, storehouse district and parking district. Adopting advanced logistics equipment is the key assurance that the enterprise can ensure the high speed circulation of logistics. Logistics equipment should have such functions as fast information issuing, electronic commerce, storehouse entry-exit recording, mechanical transport, intelligent access, etc.
The project is estimated to achieve an annual business income of 27.1 million USD and the total profit of 7.03 million USD. The project’s annual net profit after tax is 5.27 million USD according to the standard that the income tax covers 25% of the total profit.
IV. Cooperation Mode & Content
Joint-venture, cooperative or sole-invested construction
V. Chinese Party Introduction
Taizhou Luqiao Railway Development Investment Co., Ltd., established in September, 2005, is located in Xiluqiao Avenue, Luqiao District, Taizhou (9F, Cooperative Bank), with its legal reprehensive named Luo Huadi, a registered capital of 4.41 million USD. Its business items include railway, real estate, storage investment and development.
VI. Contacts
Contact: Chen Genfa
Dept.: Taizhou Luqiao Railway Development Investment Co., Ltd.
Tel: 057682589005 Fax: 0576-82429003
Add: Xiluqiao Avenue, Luqiao District, Taizhou (8F, Rural Cooperative Bank)
P.C.: 318050